Quick answer

EV charger installation in Chandler means either using an existing 120-volt outlet for Level 1 charging or adding a dedicated 240-volt circuit for a Level 2 charger, which the Department of Energy says typically adds about 25 miles of range per hour. New wiring is inspected to the 2023 National Electrical Code, which Chandler adopted with no EV-specific local amendment. SRP or APS serves each Chandler address, and their EV rate plans differ. A load calculation decides whether the panel can carry the charger.

Most people looking into an electric car charger installation in Chandler have just bought a vehicle, or are about to, and want to know what it takes to charge at home. The short version: a Level 1 cord may need nothing new, while a Level 2 charger needs its own 240-volt circuit, a conversation with the City of Chandler about the permit, and enough spare capacity in the home's electrical service.

Chandler adds one local twist. The City does not run an electric utility; SRP or APS serves each address, and the two utilities offer different rate plans and programs for EV owners. This guide covers the charger levels, the permit, the code Chandler applies, panel capacity, the SRP and APS differences and the mistakes we see most, for single-family homes inside Chandler city limits.

Key takeaways

  • The Department of Energy rates Level 1 home charging at about 5 miles of range per hour and a typical 7.2 kW Level 2 charger at about 25 miles per hour.
  • Chandler applies the 2023 National Electrical Code to plans submitted on or after July 1, 2025, and its local electrical amendments contain no rule for EV charging equipment.
  • The City's homeowner permit manual asks electrical permit plans to show conductor size and type and a panel schedule, but it does not name EV chargers, so ask Chandler Permits at 480-782-3074 how to permit yours.
  • Chandler is served by both SRP and APS, APS serves only part of the city, and the electric bill or SRP's address lookup shows which one serves a home.
  • SRP's EV Price Plan is closed to new enrollments, and SRP points EV owners to its Conserve 6-9 P.M. and Save and Manage Demand 5-10 P.M. and Save plans.
  • APS offers an EV Overnight Charging plan with an 11 p.m. to 5 a.m. weekday lowest-rate window, while its SmartCharge program is currently full with a waitlist.

What does EV charger installation in Chandler actually involve?

An EV charger installation is the electrical work that lets a car charge at home: a suitable outlet or a new dedicated circuit, the charging equipment itself, and the permit and inspection that go with any new wiring. The U.S. Department of Energy's Alternative Fuels Data Center (AFDC) describes three levels of charging, and only two of them belong in a house.

  • Level 1. A 120-volt AC plug. The AFDC assumes 1.9 kW of charging power and approximately 5 miles of range per hour of charging. It uses an ordinary household outlet, and APS notes that Level 1 chargers do not require upgrades and can plug directly into home outlets.
  • Level 2. 240 volts, which the AFDC calls typical in residential applications. The AFDC says most residential Level 2 chargers operate at up to 30 amps, delivering 7.2 kW, or approximately 25 miles of range per hour. SRP's charger-installation page is plain about the wiring: EV chargers require a dedicated circuit.
  • DC fast charging. Up to 500 kW and approximately 100 to 200 or more miles of range per 30 minutes, which the AFDC describes as rapid charging along heavy traffic corridors. It is public infrastructure, not a home installation.

Level 2 equipment comes in two forms: a hardwired wall unit connected straight to its circuit, or a plug-in unit that uses a 240-volt receptacle. In both cases the breaker, the wire size and the charger's rating have to agree, and that agreement is what the inspector checks. APS adds a detail many buyers miss: most electric vehicles come with both a Level 1 and a Level 2 charger, and the Level 2 charger supplied with most vehicles can charge at up to 3 kW, well under the 7.2 kW the AFDC treats as a typical home unit. So the first useful question is not which charger to buy. It is how far the car goes on a normal day and how long it sits at home.

Is Level 1 enough, or does a Chandler home need a Level 2 charger?

It depends on daily miles and hours at home, not on the size of the battery. A car that is plugged in every night only has to put back what the day used. Hours at home are the other half of the sum, and the utility rate plan often decides which of those hours count. APS's EV Overnight Charging plan names 11 p.m. to 5 a.m. on weekdays as its lowest-rate window, which is six hours. At the AFDC's rates, a Level 1 connection adds roughly 30 miles in those six hours and a typical 7.2 kW Level 2 charger roughly 150 miles. That is our arithmetic and an illustration only: the vehicle's own onboard charger, the battery's state of charge and the battery temperature all change real results.

APS publishes its own rule of thumb by daily round-trip commute. It suggests Level 1 for up to 45 miles; a 3 kW Level 2 charger for 45 to 100 miles; 7 kW for 140 to 250 miles; 11 kW for 220 to 400 miles; and 19 kW for more than 300 miles. APS says the guide assumes eight hours of overnight charging and a vehicle efficiency of 2.5 to 5 miles per kWh. Its ranges overlap and leave gaps exactly as printed, so treat them as broad bands rather than cut-offs. Read either way, the pattern is the same: a modest Level 2 circuit covers a long commute, and a larger charger mainly buys speed, which matters if the car often comes home nearly empty or has to go out again quickly.

When we size a charger for a Chandler home, we ask about the daily drive and the rate plan before we open the panel, because those two answers often allow a smaller circuit than the buyer expected. A smaller circuit can be the difference between a simple installation and a panel upgrade.

Home EV charging: miles of range added per hour, Level 1 vs Level 2 (DOE AFDC)This bar chart compares how many miles of driving range home EV charging adds, using figures from the U.S. Department of Energy's Alternative Fuels Data Center. Level 1 charging uses a 120-volt plug at about 1.9 kW and adds approximately 5 miles of range per hour of charging. Level 2 charging uses 240 volts, and a typical residential unit operating at up to 30 amps delivers 7.2 kW and adds approximately 25 miles of range per hour. Over the six-hour weekday window from 11 p.m. to 5 a.m. named in the APS EV Overnight Charging plan, our arithmetic gives about 30 miles for Level 1 and about 150 miles for Level 2. DC fast charging adds approximately 100 to 200 or more miles per 30 minutes at up to 500 kW, but it is meant for public corridor stations and is not a home installation. The conclusion is that a typical Level 2 charger adds five times the range of Level 1 in the same time, which is why longer daily drives usually call for a Level 2 circuit. The sources are the Department of Energy Alternative Fuels Data Center electricity stations page and the APS EV Overnight Charging plan page, read in November 2026, and the six-hour figures were calculated by us.Miles of range added by home chargingSource: DOE Alternative Fuels Data Center. Six-hour figures are our arithmetic.Per hour of chargingLevel 1 (120 V, 1.9 kW)5 milesLevel 2 (240 V, 7.2 kW)25 milesIn the APS 11 p.m. to 5 a.m. weekday window (6 hours, our arithmetic)Level 1 (120 V, 1.9 kW)about 30 milesLevel 2 (240 V, 7.2 kW)about 150 milesDC fast charging: about 100 to 200+ miles per 30 minutes, up to 500 kW.Public corridor stations only; not a home installation.Real results vary with the vehicle's onboard charger, battery level and temperature.
Miles of range added per hour of home charging, and over the six-hour APS weekday overnight window. The same figures are in the table below.
Home charging levels: power and range added (DOE AFDC), with a six-hour window worked out
Charging levelVoltage and power (AFDC)Range per hour of charging (AFDC)Range in 6 hours, 11 p.m. to 5 a.m. (our arithmetic)Where it is used
Level 1120 V AC plug, about 1.9 kWAbout 5 milesAbout 30 milesExisting household outlet
Level 2240 V; typical home unit up to 30 A, 7.2 kWAbout 25 milesAbout 150 milesDedicated home circuit
DC fastUp to 500 kWAbout 100 to 200+ miles per 30 minutesNot applicablePublic stations along heavy traffic corridors

How we got this table. The voltage, power and range-per-hour figures come from the U.S. Department of Energy Alternative Fuels Data Center page on electric vehicle charging stations, read in November 2026. The six-hour column is our arithmetic: the AFDC range per hour multiplied by the six hours of the 11 p.m. to 5 a.m. weekday window on the APS EV Overnight Charging plan page. It is an illustration, not measured data; the vehicle's onboard charger, battery level and temperature change real results.

Does an EV charger installation in Chandler need a City permit?

New wiring in a Chandler home goes through the City's Development Services department, and a dedicated 240-volt circuit is new wiring. The City's Home Owners Building Permit Manual (Rev. 4/09/26) sets out how electrical permits work for houses:

  • Permitted work is done by a licensed contractor unless the owner-applicant performs the work personally.
  • On a rented or leased home, a licensed contractor must pull the permit.
  • Electrical permit plans must clearly indicate the size and type of conductors being used and include a panel schedule showing the existing and new breakers.
  • The City charges a minimum permit fee; the amount is printed in the manual.
  • Work done without a permit may be charged double fees.

There is one gap to be honest about. The manual does not name EV chargers, and we found no City of Chandler page, checklist or fee specific to them. SRP's own charger-installation page tells customers to check with their municipality about permitting and inspections. The practical step is simple: before work starts, ask Chandler Permits at 480-782-3074 or rod@chandleraz.gov how your installation should be permitted. A Level 1 cord plugged into an outlet that already exists changes no wiring; adding or moving an outlet for it is a separate question for the same office, and our page on outlet installation and repair in Chandler covers that work.

Fees are paid through the City's Citizen Access Portal, and permit status and inspection results can be followed at developmentpermits.chandleraz.gov/clics. Inspections are requested on the City's inspection line, 480-782-3100, and a request made before midnight is for the next day; the homeowner manual also describes requesting inspections by text at 844-281-3520 at least one business day ahead. The permit counter is at 215 E. Buffalo St., open Monday through Friday from 8 a.m. to 5 p.m.

What electrical code applies to EV chargers in Chandler?

Chandler has adopted the 2024 editions of the International Codes together with the 2023 National Electrical Code, with local amendments, and the City says plans submitted for review on or after July 1, 2025, must comply with those editions. The building regulations are adopted by Ordinance No. 5108, in Chapter 29 of the City Code.

The local electrical amendments are short. They touch four places in the National Electrical Code: approved testing agencies (110.3(C)), exceptions to ground-fault protection (210.8(A) and 210.8(F), including listed heating and cooling equipment) and one item of the tamper-resistant receptacle section (406.12). None of them amends Article 625, the part of the NEC that covers electric vehicle equipment, and the City's amendments document contains no EV-capable or EV-ready requirement. In plain terms, Chandler has no extra local EV-charger rule: the 2023 NEC applies as written, and the City inspector applies it.

That keeps the code side predictable. The questions that change from one Chandler house to the next are capacity, the route from the panel to the parking spot, and which utility serves the address.

Will a Chandler home's panel handle a Level 2 charger?

Often, but the only reliable answer is a load calculation. That is the National Electrical Code method of adding up what the house can draw at once, from the floor area, the air conditioning, the cooking and laundry appliances, the water heater and any pool or spa equipment, and then adding the charger. A charger is a long, steady load, so it has to fit inside the service's rating along with everything else that runs on a summer evening.

On Chandler homes we put the air conditioning at the top of that list, because cooling is the load that sets the ceiling here. A charger that fits comfortably on paper in spring has to share the service with the cooling when it is plugged in on a hot evening, and the calculation has to allow for that.

SRP's charger-installation page lays out the same decision: a charger needs a dedicated circuit, a sub-panel may be needed when no circuit is available, and owners should ask their electrician whether the panel needs an upgrade. In practice the calculation lands in one of four places:

  • Room on the panel and in the service. A new breaker and a dedicated circuit to the charger location.
  • Enough capacity but no breaker spaces. A subpanel adds spaces; the City's manual says a sub-panel needs a panel schedule and that load calculations may be required.
  • Tight capacity. A smaller Level 2 circuit, or a load-management device that limits charging while other large loads run, may fit where a full-size charger would not.
  • Not enough capacity. A service upgrade, usually the most involved route, because it brings in the serving utility as well as the City.

If the answer is a service upgrade, our electrical panel upgrade guide for Chandler explains the City permit, SRP's and APS's rules for service changes and the order of work. APS also flags a rate issue on its EV page: on demand rates, higher-kW chargers increase demand, so the biggest charger is not automatically the right choice for an APS home on a demand plan. If a breaker starts tripping once charging begins, the problem needs diagnosis before more load is added; see circuit breaker repair in Chandler.

Does it matter whether SRP or APS serves my Chandler home?

Yes, for the rate plan and the programs, though not for the permit or the code. Chandler does not run an electric utility. The City lists SRP and APS as its electric providers, and the City's ballot document for the APS franchise refers to Chandler voters outside the APS service territory, which tells you APS serves only part of the city. No City or utility page we read maps the line, so we do not guess by street. The name on your electric bill is the answer; without a bill, SRP's service-area page has an address lookup tool.

SRP homes. SRP's EV Price Plan is no longer available for new enrollments. SRP now points EV owners to two time-based plans: Conserve 6-9 P.M. and Save, which has a super off-peak period from 8 a.m. to 3 p.m. every day, and Manage Demand 5-10 P.M. and Save, with on-peak hours from 5 to 10 p.m. on weekdays. SRP also runs EV Smart Charge, a program that times charging into super off-peak and off-peak periods for an eligible vehicle or charger and gives participants bill credits. SRP's page does not spell out which vehicles and chargers are eligible, so check before you buy.

APS homes. APS offers an EV Overnight Charging plan whose lowest-rate window is 11 p.m. to 5 a.m. on weekdays, with weekends always off-peak. The page we read does not state the plan's formal eligibility rules. APS's SmartCharge program is currently full, with a waitlist. APS also warns about demand rates and links a list of Qualified Technology Installers from its EV page.

Two practical points follow. First, a reliable scheduling feature, in the car or in the charger, matters in Chandler, because both utilities reward charging in particular windows and the windows differ. Second, nobody should plan around a program that is closed or full; plan the installation around what the utility offers now. Our page on SRP and APS in Chandler covers the wider differences.

Chandler EV charger: same City permit, two utility routes
ItemSRP areaAPS areaWhere it comes from
Who serves the homeName on the bill, or SRP's address lookupName on the bill; APS serves only part of ChandlerCity Locate here page; City APS franchise document; SRP service-area page
City permitAsk Chandler Permits (480-782-3074); plans show conductors and a panel scheduleSameCity Building Safety page; Home Owners Building Permit Manual
Electrical code2023 NEC as adopted; no local EV amendmentSameCity amendments to the 2024 International Codes (Ordinance No. 5108)
EV-specific rate planEV Price Plan closed to new enrollmentsEV Overnight Charging, 11 p.m. to 5 a.m. weekdays; weekends off-peakSRP EV Price Plan page; APS EV Overnight Charging page
Other plans named for EV ownersConserve 6-9 P.M. and Save (super off-peak 8 a.m. to 3 p.m. daily); Manage Demand 5-10 P.M. and Save (on-peak 5 to 10 p.m. weekdays)Not givenSRP find-a-price-plan page for EV owners
Managed-charging programEV Smart Charge; eligible vehicle or charger requiredSmartCharge currently full; waitlistSRP EV Smart Charge page; APS EV page
Charger-size cautionDedicated circuit; sub-panel or panel upgrade may be neededHigher-kW chargers increase demand on demand ratesSRP charger-installation page; APS EV page
What it means for the install (our reading)Choose a charger whose schedule can follow the SRP plan you pickSchedule charging inside the weekday overnight window; size the charger with demand in mindOur reading of the rows above

How we got this table. This matrix is our own arrangement of the City of Chandler, SRP and APS pages listed under References, read on November 27, 2026. The last row is our reading of what the utility rows mean for an installation; it is not utility advice. A cell marked Not given means the APS pages we read did not name other plans for EV owners. The table contains no prices, rates or bill-credit amounts.

What happens on the day a charger is installed?

Once the load calculation is done, the location is agreed and the permit question is settled, the work itself is straightforward. The charger location is usually set by where the car parks and where the charge port sits on the vehicle, and the circuit route is planned from the panel: through the garage wall, along the ceiling, or in conduit along an exterior wall. The contractor installs the breaker, runs conductors sized for the charger's rating, mounts and connects the charger or the 240-volt receptacle, labels the new circuit on the panel directory and tests the equipment with the vehicle if it is available.

Whether the serving utility needs to be involved depends on whether the panel or the service itself is changed, and the contractor should confirm that before the day rather than on it. A plain added circuit on a panel with room to spare is a different job from one that grows into a subpanel or a service upgrade. After the work, the City inspection is requested on 480-782-3100 and the inspector checks the circuit against the 2023 NEC as adopted. Before we leave a Chandler charger job, we set the charging schedule to the window the household's rate plan rewards and show the owner how to change it, because a factory schedule knows nothing about SRP's or APS's windows.

Can Chandler drivers rely on public chargers instead of a home charger?

Public charging helps, but the City's own network is small and concentrated downtown. The City of Chandler says it owns 25 charging stations. Sixteen are open to the public in downtown Chandler, near Dr. A.J. Chandler Park, City-owned parking garages and the Downtown Chandler Library; the other nine are used for the City fleet, including a new solar charging station. We found no source that counts every public charger in Chandler, including privately owned ones, so we do not estimate a total.

For daily driving, the arithmetic above is the stronger argument. A Level 1 cord puts back roughly 5 miles for every hour the car is plugged in at home, and a typical Level 2 charger roughly 25, while the car is parked anyway. DC fast chargers on travel corridors are built for quick stops on long trips, not for the daily top-up. For a household that charges at home, public stations become a backup for days away rather than the main supply.

What are the most common mistakes with EV charger installation in Chandler?

  • Buying the charger before the load calculation. A large wall unit chosen first can force a panel upgrade that a smaller circuit would have avoided.
  • Assuming the utility or the plan. Chandler is split between SRP and APS; a neighbor's bill or rate plan says nothing about yours.
  • Planning around a closed program. SRP's EV Price Plan no longer takes new enrollments, and APS SmartCharge is full, with a waitlist.
  • Leaving the charger on its factory schedule. Both utilities reward charging in specific windows, and they are not the same windows.
  • Ignoring demand charges on APS. APS warns that higher-kW chargers increase demand on demand rates.
  • Skipping the permit question. The City says work without a permit may be charged double fees; ask Chandler Permits before the work starts.

If outlets, breakers or wiring are already giving trouble before you add a charger, deal with that first. A home electrical inspection in Chandler is a sensible starting point when you are unsure what the house can take.

Who installs EV chargers for Chandler homes through Your Chandler Electrician?

The City's homeowner manual says permitted work is done by a licensed contractor unless the owner-applicant performs it personally, and a rented or leased home needs a licensed contractor to pull the permit. SRP advises looking for licensed electricians who are specifically experienced in EV chargers, and APS links its own list of Qualified Technology Installers.

Before you hire anyone, ask for the license number and classification, who will take out or confirm the City of Chandler permit, whether a load calculation is included, whether the quote states the circuit size against the charger's rating, and whether they have checked which utility serves your address. A contractor who installs chargers regularly can answer all of these without hesitation.

EV charger installations requested through Your Chandler Electrician are performed by Alvey Electric LLC, Arizona Registrar of Contractors license ROC 364723 (R-11, residential). The work is residential only.

Frequently asked questions

Do I need a permit to install an EV charger in Chandler?

Ask Chandler Permits before the work starts. A Level 2 charger needs a new dedicated 240-volt circuit, and Chandler handles new electrical work through permits from Development Services. The City's homeowner manual asks electrical permit plans to show conductor size and type and a panel schedule, but it does not name EV chargers, and we found no EV-specific City page. Call Chandler Permits at 480-782-3074 or email rod@chandleraz.gov to confirm how your installation should be permitted.

How much does EV charger installation cost in Chandler?

This page does not quote a price, because no public source sets one. The City of Chandler charges a minimum permit fee, listed in its Home Owners Building Permit Manual. The cost is driven by the charger level and whether it is hardwired, the distance and route from the panel to the parking spot, whether the panel has spare spaces and capacity, whether a subpanel, load-management device or service upgrade is needed, and any wall repair. A written estimate after a site visit and a load calculation is the reliable number.

SRP or APS: does it matter for an EV charger installation in Chandler?

It matters for the rate plan, not the permit. The City permit and the 2023 National Electrical Code are the same for every Chandler home. SRP's EV Price Plan is closed to new enrollments, and SRP points EV owners to its Conserve 6-9 P.M. and Save and Manage Demand 5-10 P.M. and Save plans. APS offers EV Overnight Charging with an 11 p.m. to 5 a.m. weekday window. Check the name on your bill or use SRP's address lookup.

Is a Level 1 charger enough, or do I need Level 2?

Level 1 can be enough for short daily drives. The Department of Energy rates Level 1 at about 5 miles of range per hour and a typical 7.2 kW Level 2 charger at about 25 miles per hour. APS's own guide suggests Level 1 for daily round trips of up to 45 miles, assuming eight hours of overnight charging. Longer commutes, short charging windows or a car that often comes home nearly empty point to Level 2.

Will I need a panel upgrade to install a Level 2 charger in Chandler?

Not always. A load calculation shows whether the existing service has room for a dedicated charger circuit along with the air conditioning and everything else. SRP notes that a sub-panel may be needed when no circuit is available and suggests asking your electrician whether the panel needs an upgrade. Where capacity is tight, a smaller Level 2 circuit or a load-management device can sometimes avoid a service upgrade.

Does Chandler have its own EV charger rules?

No local EV rule appears in the City's code amendments. Chandler adopted the 2023 National Electrical Code for plans submitted on or after July 1, 2025, and its local electrical amendments touch only approved agencies, some ground-fault protection exceptions and one tamper-resistant receptacle item. None amends Article 625, which covers EV equipment, and the amendments contain no EV-ready requirement, so the 2023 NEC applies as written.

Is the SRP EV price plan still available?

No. SRP says its EV Price Plan is no longer available for new enrollments. For EV owners, SRP points to Conserve 6-9 P.M. and Save, which has a super off-peak period from 8 a.m. to 3 p.m. every day, and Manage Demand 5-10 P.M. and Save, with on-peak hours from 5 to 10 p.m. on weekdays. SRP also offers EV Smart Charge for an eligible vehicle or charger.

Can I join the APS SmartCharge program?

Not right now. APS says the SmartCharge program is currently full and offers a waitlist. APS customers can look at the EV Overnight Charging plan, whose lowest-rate window runs from 11 p.m. to 5 a.m. on weekdays, with weekends always off-peak. APS also reminds customers that higher-kW chargers increase demand on demand rates, so the charger size and the plan are best chosen together.

Where can I charge an EV in public in Chandler?

The City of Chandler says it owns 25 charging stations, and 16 of them are open to the public in downtown Chandler, near Dr. A.J. Chandler Park, City-owned parking garages and the Downtown Chandler Library. The other nine serve the City fleet, including a new solar charging station. We found no source counting every public charger in Chandler, including privately owned ones, so check a current charging map before you rely on one.

Can I install my own EV charger in Chandler?

The City's homeowner manual says permitted work is done by a licensed contractor unless the owner-applicant performs the work personally, and a rented or leased home needs a licensed contractor to pull the permit. A new 240-volt charger circuit still raises the permit question and is inspected to the 2023 NEC. SRP advises using licensed electricians experienced in EV chargers, which is why many homeowners hire one.

How do I schedule a City of Chandler inspection for a new charger circuit?

Call the City's inspection line at 480-782-3100; a request made before midnight is for the next day. The City's homeowner manual also describes requesting inspections by text at 844-281-3520 at least one business day ahead. Permit status and inspection results can be followed online at developmentpermits.chandleraz.gov/clics, and the permit counter is at 215 E. Buffalo St., Monday through Friday, 8 a.m. to 5 p.m.

Who installs EV chargers requested through Your Chandler Electrician?

EV charger installations requested through Your Chandler Electrician are performed by Alvey Electric LLC, Arizona Registrar of Contractors license ROC 364723 (R-11, residential). The work covers Level 1 outlet questions, Level 2 charger circuits and the load calculation that decides whether the panel can carry the charger. The work is residential only, for homes in the City of Chandler.

The short version

Start with the daily drive and the electric bill, not the charger catalog: those two answers set the charger level and the charging window. Have a load calculation done before buying a wall unit, and ask Chandler Permits how the circuit should be permitted. If the numbers fit, a dedicated circuit is a contained job; if they do not, choose between a smaller circuit, load management and a service upgrade before anything is installed.

This page is general information about residential electrical work in Chandler, Arizona. It is not engineering, legal or code advice for a specific property. Permit rules, utility requirements and adopted codes change; confirm current requirements with the City of Chandler and your electric utility before work begins.

References

  1. City of Chandler Development Services, Building Safety: plan review, permits and inspections (2024 International Codes and 2023 NEC for plans submitted on or after July 1, 2025; Citizen Access Portal; inspection line; office hours) https://www.chandleraz.gov/government/departments/development-services/building-safety-plan-review-permits-and-inspections. Read November 27, 2026.
  2. City of Chandler, Amendments to the 2024 International Codes (Ordinance No. 5108, local NEC amendments) https://www.chandleraz.gov/sites/default/files/departments/development-services/City-of-Chandler-Amendments-to-the-2024-International-Codes.pdf. Read November 27, 2026.
  3. City of Chandler, Home Owners Building Permit Manual (Rev. 4/09/26) https://www.chandleraz.gov/sites/default/files/departments/development-services/City-of-Chandler-Home-Owners-Building-Permit-Manual.pdf. Read November 27, 2026.
  4. City of Chandler Economic Development, Locate here (utilities: SRP, APS, Southwest Gas) https://www.chandleraz.gov/business/economic-development/locate-here. Read November 27, 2026.
  5. City of Chandler, Granting a Franchise to Arizona Public Service Company (APS) ballot document https://www.chandleraz.gov/sites/default/files/departments/city-clerk/City-of-Chandler-Granting-a-Franchise-to-Arizona-Public-Service-Company-APS.pdf. Read November 27, 2026.
  6. City of Chandler, Sustainable fleet (City-owned EV charging stations) https://www.chandleraz.gov/government/city-managers-office/sustainability/sustainable-fleet. Read November 27, 2026.
  7. Salt River Project, EV charger installation (dedicated circuit, sub-panel, permits) https://www.srpnet.com/customer-service/electric-vehicles/charger-install. Read November 27, 2026.
  8. Salt River Project, Find a price plan for EV owners https://www.srpnet.com/energy-savings-rebates/home/electric-vehicles/find-a-priceplan. Read November 27, 2026.
  9. Salt River Project, Electric Vehicle Price Plan (closed to new enrollments) https://srpnet.com/price-plans/residential-electric/electric-vehicle. Read November 27, 2026.
  10. Salt River Project, EV Smart Charge https://www.srpnet.com/energy-savings-rebates/home/electric-vehicles/smart-charge. Read November 27, 2026.
  11. Salt River Project, Service area and territory (address lookup) https://www.srpnet.com/about/service-area-territory. Read November 27, 2026.
  12. APS, Electric vehicles (SmartCharge, charger levels, demand rates, commute guide) https://www.aps.com/ev. Read November 27, 2026.
  13. APS, EV Overnight Charging 11pm-5am Weekdays plan https://www.aps.com/en/Residential/Service-Plans/Compare-Service-Plans/EV-Overnight-Charging-11pm-5am-Weekdays. Read November 27, 2026.
  14. U.S. Department of Energy, Alternative Fuels Data Center, Electric vehicle charging stations (charging levels and range per hour) https://afdc.energy.gov/fuels/electricity-stations. Read November 27, 2026.

Plan your home charger

Request a load calculation and a written estimate for an EV charger at your Chandler home.

Request an estimate

Talk it through first

Call 480-939-3336 and describe what you need.

Call 480-939-3336

About this page

Written by the Your Chandler Electrician editorial team from the sources listed above. Reviewed by Robert "Bob" Lira, licensed Arizona electrical contractor, ROC 338369. Your Chandler Electrician, 2139 N Yucca Ct, Chandler, AZ 85224, phone 480-939-3336, serves homes in the City of Chandler. Electrical work is performed by Alvey Electric LLC, Arizona Registrar of Contractors license ROC 364723 (R-11, residential).

Updated .