Quick answer
An electrical panel upgrade in Chandler replaces a home's service equipment so it can carry more load, in our experience often from 100 to 200 amps. It needs a City of Chandler electrical permit, with a $60 minimum fee, and is inspected to the 2023 National Electrical Code as adopted by the City. Chandler runs no electric utility: SRP or APS serves each address, and neither restores power until the City approves the work. A load calculation decides the size.
People who search "electrical panel upgrade Chandler AZ" usually start from a specific trigger: an electrical panel inspection that turned something up, a breaker that will not stay on in July, an electrician who said the panel is full, or an EV charger or solar quote with a line item nobody explained. This guide covers what the job is, when a Chandler home needs it and when it does not, how the City of Chandler permit works, and why the first question in Chandler is whether SRP or APS serves the house. It is written for single-family homes inside Chandler city limits.
Key takeaways
- A Chandler service upgrade needs a City permit; the City's homeowner manual sets a $60 minimum permit fee and says unpermitted work may be charged double fees.
- Chandler is served by SRP and APS, APS serves only part of the city, and the electric bill or SRP's address lookup shows which one serves a home.
- SRP asks customers to contact both SRP and the City before any panel modification or repair, and reconnects only when both approve.
- APS will not energize or restore service until the wiring is approved and the inspection authority gives notice, and it needs three days' notice to de-energize outside an emergency.
- Chandler applies the 2024 International Codes and the 2023 National Electrical Code to plans submitted on or after July 1, 2025.
- A load calculation, not the age of the panel, decides whether a home needs more amperage.
What is an electrical panel upgrade, and how is it different from a panel replacement?
The electrical service is the set of equipment that brings utility power into a house and divides it into circuits: the meter, the main breaker, the service conductors and the panel of branch breakers. Its size is stated in amps, and that rating is the ceiling on how much the house can draw at once. "Panel upgrade" is used loosely for three different jobs, and which one you actually need decides the permit scope, how involved the utility gets and what the estimate looks like.
- Panel replacement. The breaker panel is swapped for a new one at the same amperage. This suits a panel that is damaged, out of spaces or no longer trustworthy, when the service itself is big enough.
- Service upgrade. The capacity of the whole service goes up, for example from 100 amps to 200 amps. The meter section, service conductors, main breaker, grounding and panel are all addressed, and the serving utility has to be involved before anything is disconnected.
- Subpanel. A second panel is fed from the main one to add breaker spaces in a garage, casita or addition. It adds room for circuits, not capacity. The City of Chandler's homeowner permit manual says adding a sub-panel needs a panel schedule and that load calculations may be required.
Most of this page is about the service upgrade, because it is the job that raises questions about the City of Chandler permit, the utility that serves the address and the order of work. Replacement and subpanels come back in the section on choosing between repair, replacement and upgrade.
When does a Chandler home actually need more electrical capacity?
A home needs a larger service when the calculated load of everything connected to it exceeds what the service is rated to carry. That is arithmetic, not a judgment about the age of the house or the look of the panel. The National Electrical Code sets out the method, and a contractor works through it from the floor area, the air conditioning, the cooking and laundry appliances, the water heater, any pool or spa equipment, and whatever is about to be added.
Cooling is the load that shapes most Chandler calculations. The National Weather Service office for the metro area recorded 70 days at or above 110°F and 143 days at or above 100°F at Phoenix Sky Harbor in 2024; that is the metro's official station, not a Chandler reading, but it describes the summer every East Valley home lives through. Air conditioning runs hardest on those afternoons, often alongside pool pumps, laundry and cooking, so a service that was sized for the house as built can sit close to its limit before anything new arrives. The additions that most often push a Chandler home over are:
- a Level 2 electric-vehicle charger, a large load that can run for hours;
- a second air conditioner or heat pump for an addition or casita;
- replacing gas appliances with electric ones;
- a pool, a spa, or a workshop with 240-volt tools;
- a solar or battery system whose connection the existing panel cannot accept.
Some warning signs point to the equipment rather than the capacity: a breaker that feels hot, a panel that buzzes, scorch marks, a burning smell, or lights that dim hard when the air conditioner starts. Those call for a prompt inspection, which may end in a repair, a replacement or an upgrade. When we are asked to quote an upgrade, we run the load calculation before anything else, because it is common to find that the real problem is one overloaded circuit, which a bigger service would not fix. For a single breaker that keeps tripping, see circuit breaker repair in Chandler.
Does a panel upgrade in Chandler need a City permit?
Yes. A service upgrade changes the electrical system, and Chandler handles that work through a building permit from its Development Services department. Fees are paid through the City's Citizen Access Portal, and permit status and inspections are tracked online at developmentpermits.chandleraz.gov/clics. The permit counter is at 215 E. Buffalo St., open Monday through Friday from 8 a.m. to 5 p.m., and Chandler Permits can be reached at 480-782-3074 or rod@chandleraz.gov.
The City's Home Owners Building Permit Manual adds several points that matter for panel work:
- Permitted work is done by a licensed contractor unless the owner-applicant performs the work personally.
- On a rented or leased home, a licensed contractor must pull the permit, citing A.R.S. 32-1121A.
- The minimum permit fee is $60.
- Work done without a permit may be charged double fees.
- Adding a sub-panel needs a panel schedule, and load calculations may be required.
One grey area is worth knowing about. Chandler's amendments to the residential code exempt some repair or replacement of overcurrent devices, and the homeowner manual allows certain like-for-like work under conditions. That does not make a breaker swap automatically permit-free, and it never covers a change in service size. If your job is anything less than a full upgrade, ask Chandler Permits at 480-782-3074 whether it needs a permit before the work starts. The permit matters beyond paperwork: as the utility sections below explain, neither SRP nor APS restores power to a modified service until the City has approved the installation.
Which electric utility serves your Chandler home, and why does it matter for a panel upgrade?
Chandler does not run an electric utility of its own. The City's economic development office lists SRP and APS as the electric providers, and the City's own franchise documents for APS describe a measure placed before Chandler voters outside the APS service territory, which tells you APS serves only part of the city. No City or utility page we read maps which neighborhoods fall on which side, so we do not guess by street. The name on your electric bill is the answer; if you do not have a bill handy, SRP's service-area page has an address lookup tool.
The split changes who your contractor coordinates with, and the two utilities write their rules differently.
- SRP customers. SRP's electric service specifications tell customers to contact both SRP and the authority having jurisdiction, which here is the City of Chandler, before making any panel modification or repair. SRP defines a modification broadly, including a change in ampacity, added load and relocation. Seals and meters are not to be touched by unauthorized persons. SRP reconnects power only when both SRP and the City approve the service entrance work, and it will not energize an installation until the City has approved it. New and upgraded services go through SRP construction services at (602) 236-0777 and SRP's Project Plan Portal.
- APS customers. APS's Electric Service Requirements Manual says APS will not energize or restore service until the wiring has been approved and the inspection authority has given notice, and that only authorized APS employees may break seals or move, relocate or replace meters. A non-emergency de-energization needs three days' advance notice. APS also sets meter and main location rules: outdoors on an exterior wall, not under a carport or patio, with the meter between 48 and 75 inches high and 36 inches of clear working space. Service upgrades are coordinated through the APS Control Desk, and the APS Construction Helpline is 602-371-6140.
We check the utility before we price anything on a Chandler service upgrade, because the people who schedule the disconnect, the meter rules and the reconnection paperwork all differ by route. For a fuller side-by-side, see SRP and APS in Chandler explained.
What are the steps of a panel upgrade in Chandler?
The order of work is the same on nearly every Chandler service upgrade. Three parties control one piece each: the contractor, the City of Chandler and whichever utility serves the address. The permit and the code are identical on both routes; the utility steps are not.
| Step | SRP area | APS area | Document behind it |
|---|---|---|---|
| 1. Find your utility | Name on the bill, or SRP's address lookup | Name on the bill; APS serves only part of Chandler | City of Chandler economic development page; City APS franchise document; SRP service-area page |
| 2. Load calculation | Licensed contractor | Licensed contractor | Trade practice (National Electrical Code method); City homeowner manual for sub-panels |
| 3. City of Chandler permit | Required; minimum fee $60 | Same | City Building Safety page; City Home Owners Building Permit Manual |
| 4. Utility contact | Contact SRP and the City before any panel modification; SRP construction services (602) 236-0777 | APS Control Desk; Construction Helpline 602-371-6140; 3 days' notice to de-energize | SRP Electric Service Specifications section 1; SRP construction services page; APS Electric Service Requirements Manual sections 100 and 300 |
| 5. Install to code | 2023 NEC as adopted by Chandler | Same | City of Chandler amendments to the 2024 International Codes (Ordinance No. 5108) |
| 6. Inspect, then reconnect | City inspection; SRP reconnects when SRP and the City approve | City inspection; APS restores after approval and notice | City inspection line 480-782-3100; SRP section 1; APS section 100 |
How we got this table. This matrix is our own arrangement of City of Chandler, SRP and APS documents listed under References, read on November 25 and 27, 2026. Steps 1 and 3 to 6 come from those documents; the load calculation in step 2 describes standard trade practice except for the sub-panel note from the City manual. No source we read describes which parts of Chandler each utility serves or a residential meter-release procedure, so neither is shown. The table contains no prices other than the City's own minimum permit fee.
What happens on the day of a Chandler panel upgrade?
Once the permit is issued and the utility has a date, power to the house is disconnected. The contractor removes the old equipment, mounts the new service equipment, installs the service conductors and main breaker, brings grounding and bonding up to the current code, and lands each branch circuit on a correctly sized breaker, labeling as they go. Anything in the old panel that cannot go back safely, such as two wires under one breaker screw or brittle insulation, is corrected then, because the inspector will look. City inspections are requested on the inspection line at 480-782-3100, and a request made before midnight is for the next day; the homeowner manual also describes requesting inspections by text at 844-281-3520 at least one business day ahead. After the inspection passes, the serving utility restores permanent power. In our experience the house is without electricity for most of the working day, so plan refrigeration, medical equipment and cooling around that.
What electrical code applies to a panel upgrade in Chandler?
Chandler has adopted the 2024 editions of the International Codes together with the 2023 National Electrical Code, with local amendments, and the City says all plans submitted for review on or after July 1, 2025, must be designed to comply with those editions. The building regulations are adopted by Ordinance No. 5108 in Chapter 29 of the City Code.
Chandler's local electrical amendments are narrow. They are mostly exceptions to ground-fault (GFCI) protection, for receptacles that are not readily accessible and for listed air-conditioning, heating and cooling equipment, plus an addition allowing testing agencies approved by the City's building official, and the deletion of one item from the tamper-resistant receptacle section. None of the amendments we read changes how a residential service is sized or connected, so for a service upgrade the inspector is applying the 2023 National Electrical Code largely as published.
| Item | What the City document says | What it means on a service upgrade (our reading) |
|---|---|---|
| Code editions | 2024 International Codes and the 2023 National Electrical Code, with Chandler amendments | The new service is designed and inspected to the 2023 NEC |
| Effective point | Plans submitted for review on or after July 1, 2025 | Any upgrade permitted now falls under these editions |
| Adopting ordinance | Ordinance No. 5108, City Code Chapter 29 | Where to look if a question about the local text comes up |
| GFCI exceptions | Exceptions for receptacles not readily accessible and for listed HVAC equipment | Affects some receptacles near cooling equipment, not the service itself |
| Approved agencies | Adds testing agencies approved by the City's building official | Equipment must carry an accepted listing; use standard listed gear |
How we got this table. The middle column summarizes the City of Chandler's building safety page and its amendments to the 2024 International Codes, read on November 27, 2026. The right-hand column is our own reading of how each item shows up on a residential service upgrade; it is not a code interpretation by the City, and the inspector's decision governs.
On older panels we often find labeling that would not pass today: circuit directories that are blank, wrong or faded. Relabeling every circuit is part of a proper upgrade, not an extra.
How do you choose between 100, 200 and 400 amps for a Chandler home?
The right size is the one the load calculation supports, with room for what you plan to add in the next several years. The table below is a way to think about it, not a substitute for the calculation.
| Service size | Where it is usually found | What it means for a Chandler home |
|---|---|---|
| 100 amps | Older and smaller homes, often with gas heating and cooking | Can be adequate for a small home with one air conditioner; leaves little room for an EV charger or electric appliances |
| 200 amps | In our experience, the most common size on single-family homes | The usual target of an upgrade, with room for a Level 2 charger in many homes |
| 400 amps | Large homes with several air conditioners, a pool and spa, or more than one EV charger | More equipment, more utility review and a larger job; raise it early with SRP or APS |
How we got this table. The descriptions are general trade practice, not measured data for Chandler, and no City of Chandler document sets a service size by home type. Your own home is decided by its load calculation.
This is a city of houses: the City reports that 71.7% of Chandler homes are single-family and that nearly 7,000 single-family homes have been completed since 2013. Newer and older homes alike end up on this question when a charger, a pool or an all-electric kitchen is planned. Sizing once costs less than sizing twice, so say what is likely before the calculation is run.
After an electrical panel inspection in Chandler, should you repair, replace or upgrade?
These are three answers to three different findings, and a good assessment names which one applies and why.
Repair fits a panel that is sound and large enough but has one failed part, such as a worn breaker, a loose connection or a corroded lug. Outdoor equipment in the desert takes a beating from heat and sun, and one weak breaker is a repair, not a reason to replace the service. Whether a like-for-like breaker replacement needs a permit is a question for Chandler Permits, as noted above.
Replacement at the same amperage fits a panel that is no longer trustworthy as a whole: rust or water damage, heat damage on the bus, no spaces left when the service is large enough, or an older design for which safe replacement breakers are hard to get. The meter and service size stay as they are, which keeps the utility's role smaller, though on an SRP address SRP still asks to be contacted before any panel modification or repair.
A service upgrade fits a home whose calculated load is more than the service rating, now or after a planned addition. A new panel alone changes nothing there, because the limit is the service.
What should a written panel upgrade estimate list?
Estimates are hard to compare unless they describe the same scope. Ask each contractor to state the proposed amperage and the load calculation behind it; the equipment and confirmation that it meets SRP's or APS's requirements for your address; who takes out the City of Chandler permit; who contacts the utility and schedules the disconnect; what is included if old wiring, grounding or bonding has to be corrected; who patches the stucco if the enclosure changes size or the meter has to move to meet utility location rules; and the contractor's Arizona license number and classification. When two estimates differ widely, they usually differ on the wiring corrections and the wall repair.
How does a panel upgrade fit with an EV charger or solar in Chandler?
These projects are often discussed separately and decided together. A charger adds a large load; a solar or battery system adds a source the panel must be rated to accept. Either can be the reason a service that worked for years no longer adds up on paper. The sensible order is one load calculation that includes everything planned, one decision on service size, then the permit and the utility paperwork.
If a charger is the only addition, a load-management device can sometimes avoid a service upgrade, and a contractor should price both routes. Both utilities also have their own processes for anything that connects generation to their system, so a solar or battery project is a reason to involve SRP or APS early rather than late. More detail is on EV charger installation in Chandler, and backup power is covered on home generator installation in Chandler.
What are the most common mistakes with electrical panel upgrades in Chandler?
- Assuming the utility. Chandler is split between SRP and APS, and the neighbor's bill is not proof of yours. Read your own bill or use SRP's address lookup.
- Ordering equipment before the utility is confirmed. Meter rules, scheduling and reconnection paperwork differ between SRP and APS.
- Leaving the disconnect to the last minute on an APS address. APS asks for three days' advance notice to de-energize a service outside an emergency.
- Upgrading capacity to fix a circuit problem. A bigger service does not stop one overloaded circuit from tripping. Diagnose first.
- Skipping the permit. The City says unpermitted work may be charged double fees, and neither utility re-energizes a modified service until the City has approved it.
- Touching the meter or its seal. SRP prohibits seal-breaking by unauthorized persons, and APS allows only its own employees to break seals or move meters.
- Not planning for the outage. The power is off for the working day. In summer, arrange somewhere cool to be.
A full check of the rest of the house before or after the upgrade is covered on home electrical inspections in Chandler, and smaller faults on electrical repair in Chandler.
Who is allowed to do electrical panel upgrade work in Chandler?
Arizona licenses contractors through the Registrar of Contractors, and the Arizona Administrative Code describes the R-11 Electrical classification as allowing the licensee to install and repair residential electrical systems. Chandler's homeowner manual says permitted work is done by a licensed contractor unless the owner-applicant performs it personally, and a rented or leased home needs a licensed contractor to pull the permit.
Before you hire anyone, ask three things: the license number and classification, who will take out the City of Chandler permit, and whether they have confirmed with SRP or APS what your address needs. A contractor who does this work regularly can answer all three without looking anything up.
Panel upgrades requested through Your Chandler Electrician are performed by Alvey Electric LLC, Arizona Registrar of Contractors license ROC 364723, a residential electrical contractor. The work is residential only.
Frequently asked questions
Do I need a permit to upgrade an electrical panel in Chandler?
Yes. A service upgrade changes the electrical system and needs a City of Chandler permit, inspected to the 2023 National Electrical Code as adopted by the City. The City's homeowner manual sets a $60 minimum permit fee and says work done without a permit may be charged double fees. Questions go to Chandler Permits at 480-782-3074.
How much does an electrical panel upgrade cost in Chandler?
This page does not quote a price because no public source sets one; the only published figure is the City's $60 minimum permit fee. The cost depends on the amperage, whether the meter section and service conductors are replaced, whether the meter has to move to meet SRP or APS location rules, how much old wiring and grounding has to be corrected, and how much stucco has to be patched. A written estimate after a site visit and a load calculation is the reliable number.
Is my Chandler home served by SRP or APS?
Look at the name on your electric bill. Chandler is served by both SRP and APS, and APS serves only part of the city; no public map we read shows the line by neighborhood. If you do not have a bill handy, SRP's service-area page has an address lookup tool. The answer decides who your contractor coordinates the service change with.
Who do I call first, the electrician or the utility?
Call the electrician first. The contractor runs a load calculation to confirm what the home needs, then coordinates with the serving utility before the service is changed. SRP asks that both SRP and the City be contacted before any panel modification, and APS coordinates service upgrades through its Control Desk with three days' notice to de-energize.
How do I schedule a City of Chandler electrical inspection?
Call the City's inspection line at 480-782-3100; a request made before midnight is for the next day. The City's homeowner manual also describes requesting inspections by text at 844-281-3520 at least one business day ahead. Permit status and inspection results can be followed online at developmentpermits.chandleraz.gov/clics.
Can I upgrade my own electrical panel in Chandler?
The City's homeowner manual says permitted work is done by a licensed contractor unless the owner-applicant performs the work personally, and a rented or leased home needs a licensed contractor to pull the permit. A service upgrade still needs a permit, an inspection and coordination with SRP or APS, and neither utility allows unauthorized people to break meter seals, which is why many homeowners choose a licensed electrical contractor.
Does replacing a breaker in Chandler need a permit?
It depends on the job. Chandler's code amendments exempt some repair or replacement of overcurrent devices, and the homeowner manual allows certain like-for-like work under conditions, but neither covers a change in service size. Ask Chandler Permits at 480-782-3074 whether your specific job needs a permit before the work starts.
What electrical code does Chandler use for a panel upgrade?
Chandler has adopted the 2024 International Codes and the 2023 National Electrical Code, with local amendments, for plans submitted for review on or after July 1, 2025. The local electrical amendments are narrow, mostly exceptions to GFCI protection for listed HVAC equipment and receptacles that are not readily accessible.
Do I need a panel upgrade to install an EV charger in Chandler?
Not always. It depends on the spare capacity a load calculation shows. If the service cannot carry a Level 2 charger along with the air conditioning and everything else, the options are a service upgrade or a load-management device, and a contractor should price both.
What is the difference between a panel replacement and a service upgrade?
A panel replacement swaps the breaker panel for a new one at the same amperage. A service upgrade raises the capacity of the whole service, which usually means a new meter section, new service conductors and a larger main breaker as well as the panel. The service upgrade is the job that needs the most coordination with SRP or APS.
What should I do if my electrical panel is sparking, buzzing or smells hot?
If there is smoke or fire, leave the house and call 911. Keep away from any fallen power line and call 911; APS says to stay at least 100 feet away and then call APS at 602-258-5483. For outages, SRP customers can call 602-236-8888 and APS customers 602-371-3680 or 855-688-2437. Then have the panel inspected before it is used again.
Who performs panel upgrades requested through Your Chandler Electrician?
Panel upgrades requested through Your Chandler Electrician are performed by Alvey Electric LLC, Arizona Registrar of Contractors license ROC 364723, a residential electrical contractor. The Arizona Administrative Code describes the R-11 Electrical classification as allowing the licensee to install and repair residential electrical systems. The work is residential only.
The short version
Settle whether SRP or APS serves the address before anything is priced, because that decides who schedules the disconnect and how the reconnection is released. Size the service from a load calculation that includes what you plan to add, not from the age of the panel. Then let the City of Chandler permit, the utility coordination, the work, the inspection and the reconnection happen in that order.
This page is general information about residential electrical work in Chandler, Arizona. It is not engineering, legal or code advice for a specific property. Permit rules, utility requirements and adopted codes change; confirm current requirements with the City of Chandler and your electric utility before work begins.
References
- City of Chandler Development Services, Building Safety: plan review, permits and inspections (2024 International Codes and 2023 NEC for plans submitted on or after July 1, 2025; Citizen Access Portal; inspection line; office hours). https://www.chandleraz.gov/government/departments/development-services/building-safety-plan-review-permits-and-inspections. Read November 27, 2026.
- City of Chandler, Amendments to the 2024 International Codes (Ordinance No. 5108, local NEC and IRC amendments). https://www.chandleraz.gov/sites/default/files/departments/development-services/City-of-Chandler-Amendments-to-the-2024-International-Codes.pdf. Read November 27, 2026.
- City of Chandler, Home Owners Building Permit Manual (Rev. 4/09/26). https://www.chandleraz.gov/sites/default/files/departments/development-services/City-of-Chandler-Home-Owners-Building-Permit-Manual.pdf. Read November 27, 2026.
- City of Chandler Economic Development, Locate here (utilities: SRP, APS, Southwest Gas). https://www.chandleraz.gov/business/economic-development/locate-here. Read November 27, 2026.
- City of Chandler, Granting a Franchise to Arizona Public Service Company (APS) ballot document. https://www.chandleraz.gov/sites/default/files/departments/city-clerk/City-of-Chandler-Granting-a-Franchise-to-Arizona-Public-Service-Company-APS.pdf. Read November 27, 2026.
- City of Chandler, Housing in Chandler (housing mix and single-family completions). https://www.chandleraz.gov/explore/about-chandler/housing-in-chandler. Read November 27, 2026.
- Salt River Project, Electric Service Specifications, section 1 general (panel modifications, seals, reconnection). https://SRPnet.com/assets/srpnet/pdf/doing-business/builders-developers-contractors/commercial-specifications-guidelines-and-handbooks/ESS-section-1-general.pdf. Read November 27, 2026.
- Salt River Project, Construction services. https://www.srpnet.com/electric/business/ccs. Read November 27, 2026.
- Salt River Project, Service area and territory (address lookup). https://www.srpnet.com/about/service-area-territory. Read November 27, 2026.
- Salt River Project, Outages and storm safety. https://www.srpnet.com/customer-service/safety/outages-storm. Read November 27, 2026.
- APS, Electric Service Requirements Manual, section 100 (energizing, seals, notice to de-energize). https://www.aps.com/-/media/APS/APSCOM-PDFs/About/Construction-and-Power-Line-Siting/Construction-Services/Electric-Service-Requirements-Manual/100.pdf. Read November 27, 2026.
- APS, Electric Service Requirements Manual, section 300 (meter and main location, service upgrades). https://www.aps.com/-/media/APS/APSCOM-PDFs/About/Construction-and-Power-Line-Siting/Construction-Services/Electric-Service-Requirements-Manual/300.pdf. Read November 27, 2026.
- APS, Contact us (outage, downed line and Construction Helpline numbers). https://aps.com/en/utility/contact-us. Read November 27, 2026.
- National Weather Service Phoenix, 2024 year in review (Phoenix Sky Harbor days at or above 110°F and 100°F). https://weather.gov/psr/yearinreview2024. Read November 27, 2026.
- Arizona Administrative Code R4-9-103, Residential Contractor License Classifications and Scopes of Work (R-11 Electrical). https://www.law.cornell.edu/regulations/arizona/Ariz-Admin-Code-SS-R4-9-103. Read November 25, 2026.
Have your service checked
Request a load calculation and a written estimate for your Chandler home.
Related pages
- Circuit breaker repair and replacement in Chandler
- EV charger installation in Chandler
- SRP and APS in Chandler explained
- Home electrical inspections in Chandler
- Electrical repair and troubleshooting in Chandler
- Home generator installation in Chandler
- Chandler neighborhoods we serve
- Your Chandler Electrician home
About this page
Written by the Your Chandler Electrician editorial team from the sources listed above. Reviewed by Robert "Bob" Lira, licensed Arizona electrical contractor, ROC 338369. Your Chandler Electrician, 2139 N Yucca Ct, Chandler, AZ 85224, phone 480-939-3336, serves homes in the City of Chandler. Electrical work is performed by Alvey Electric LLC, Arizona Registrar of Contractors license ROC 364723 (R-11, residential).
Updated .